History

Founded in 1962, Doosan Heavy Industries & Construction was successfully privatized when it joined the Doosan Group in 2000. The company has since been on the path to global leadership in power and water sectors.

Business Establishment 1962~1980

  • Founded Hyundai Yanghaeng

    1962, Founded Hyundai Yanghaeng

    Established on September 20, 1962 as Hyundai Yanghaeng , the company started out as a trading firm, importing raw materials and equipment for manufacturing and construction as well as cement.

  • Built Gunpo Plant

    1973, Built Gunpo Plant

    Built Gunpo Plant in Gunpo, Gyeonggido, to produce castings, machinery and forgings, paving the way for the company’s growth into a machinery and heavy industry company.

  • Groundbreaking of Changwon Plant

    1976, Groundbreaking of Changwon Plant

    In step with the government’s heavy chemical industry promotion policy, the company embarked on a historic project to build Changwon Plant.

  • First Power Equipment Order from CE

    1976, First Power Equipment Order from CE

    Won first heat recovery steam generator orders from US-based CE for cogeneration plants in Yeongweol, the first order to manufacture finished products.

  • First Desalination Project, Farasan

    1978, First Desalination Project, Farasan

    Won an order to supply equipment to the Farasan project in Saudi Arabia, the company’s first desalination project.

  • Korea’s First Bituminous Coal-fired Samcheonpo Thermal Plant Units 1 and 2 Order

    1979, Korea’s First Bituminous Coal-fired Samcheonpo Thermal Plant Units 1 and 2 Order

    Won a turnkey order for Samcheonpo thermal power plant 560MW units 1 and 2, Korea’s largest coal-fired thermal project at the time. With this project, the company began to accumulate technological expertise.

  • Nationalization

    1980, Nationalization

    Renamed Hanjung as a government-invested public enterprise.

Growth and Development 1981~2000

  • Completed Construction of Changwon Plant

    1982, Completed Construction of Changwon Plant

    One of the world’s largest integrated manufacturing plants at the time, Changwon Plant construction was finished six years after the groundbreaking in 1976. The Changwon Plant opened a new chapter in Korea’s industrial plant sector as the engine behind the company’s growth. (Photo: The completion ceremony of Changwon Plant received big attention with the attendance of the country’s president.)

  • Korea’s Only 13,000-ton Press in Operation

    1982, Korea’s Only 13,000-ton Press in Operation

    Changwon Plant was a far-sighted investment, having the world’s largest 13,000-ton press facility at a time when casting production lines were almost nonexistent.

  • First Historic Turnkey Seawater Desalination Plant Order

    1985, First Historic Turnkey Seawater Desalination Plant Order

    Won an order in January for the Assir desalination project in Saudi Arabia. It was the first turnkey order led by a consortium with the US-based desalination engineering company ESCO to perform design, manufacturing, installation, construction and commissioning.

  • Order to Supply Major Equipment to Yeonggwang Nuclear Plant Units 3 and 4

    1987, Order to Supply Major Equipment to Yeonggwang Nuclear Plant Units 3 and 4

    Yeonggwang nuclear plant units 3 and 4 are Korea’s first 1,000 MW major plants that adopted the OPR1000 Korean standard plant design.

  • Uljin Nuclear Power Plant Named Plant of the Year by POWER Magazine

    1991, Uljin Nuclear Power Plant Named Plant of the Year by POWER Magazine

    The successful completion of electric power construction for Uljin Nuclear Power Plant units 3 and 4 (May 1992 – December 1999) was well received as having opened a new chapter for Korea’s nuclear technology.

  • Shuaibah Desalination Plant Order from Saudi Arabia

    1993, Shuaibah Desalination Plant Order from Saudi Arabia

    Won an order worth US$950 million from Saline Water Conversion Corporation of Saudi Arabia to build Shuaibah desalination plant.

  • ISO 9001 Certification

    1993, ISO 9001 Certification

    Obtained ISO 90001 certification, a quality standard requirement.

  • Quality Management Award

    1993, Quality Management Award

    Received the National Quality Management Award organized by the Korean Standards Association in recognition of its performance in new product development, quality assurance and productivity improvement.

  • Completed First Korea-Standard Thermal Plant

    1994, Completed First Korea-Standard Thermal Plant

    Completed in April the manufacturing, supply and installation of major equipment such as boilers and turbine generators for Boryeong thermal plant units 3 through 6, Korea’s first 500 MW coal-fired thermal project to adopt the standardized design.

  • Established Joint Venture in Hai Phong, Vietnam

    1995, Established Joint Venture in Hai Phong, Vietnam

    Set up HANVICO, a 70:30 joint venture between Doosan Heavy Industries & Construction and the state-run heavy manufacturer DMF of Vietnam.

  • First 800 MW Thermal Plant Equipment Order

    1996, First 800 MW Thermal Plant Equipment Order

    Won an order for major equipment for Korea’s first 800 MW Yeongheung coal-fired thermal plant.

  • Qinshan Phase 3 Nuclear Plant Order

    1997, Qinshan Phase 3 Nuclear Plant Order

    Won an order for steam generators for Qinshan Phase 3 nuclear plant units 1 and 2 in China from China National Nuclear Corporation (CNNC), the company’s first nuclear equipment sales overseas.

  • Sequoyah Nuclear Plant Order

    1999, Sequoyah Nuclear Plant Order

    Won an order for replacement steam generators for Sequoyah nuclear power plant unit 1 in the US, making the company’s first export to the birthplace of nuclear power 30 years after Korea’s first adoption of nuclear plant technology.

  • Power Facility Centralization

    1999, Power Facility Centralization

    The Korean government designated one single company to supply power plant facilities in an attempt to restructure business structure of major companies and promote the nation’s competitiveness in the industry.

  • Became Public and Listed on the Stock Exchange

    2000, Became Public and Listed on the Stock Exchange

    Began to be traded on the stock exchange on October 25 under the stock code 34020.

  • Doosan Selected Preferred Bidder for Hanjung

    2000, Doosan Selected Preferred Bidder for Hanjung

    A consortium led by the Doosan Group selected the preferred bidder to acquire Korea Heavy Industries & Construction (“Hanjung”) and Doosan’s acquisition of Hanjung is considered to be the most successful privatization and M&A in Korea’s history.

Successful Privatization and Leap 2001 ~ 2007

  • Privatization and Change of Company Name

    2001, Privatization and Change of Company Name

    Changed company name as a private enterprise with a spirit of challenge and innovation and integrated its CI with Doosan to maximize synergy of privatization. (Photo: Announcement of Fresh Start at Changwon headquarters on May 4, 2001)

  • UAE Fujairah Desalination Plant Order

    2001, UAE Fujairah Desalination Plant Order

    Won a US$ 800 million order from UAE state-owned UOG to deliver Fujairah desalination plant. This project propelled the company to the top of the global desalination market. In the same year, the company’s desalination plant was chosen as the World-Class Product.

  • Change Vision Announcement

    2003, Change Vision Announcement

    Announced a vision to become a plant specialist, aiming to deliver superior value through world-class technology and cost competitiveness.

  • Global HRSG Leadership

    2003, Global HRSG Leadership

    Ranked the world’s top supplier of HRSGs after delivering 64 units in 2003

  • Shuaibah Phase 3 Desalination Plant Order from Saudi Arabia

    2005, Shuaibah Phase 3 Desalination Plant Order from Saudi Arabia

    Won an order worth US$ 850 to deliver the Shuaibah Phase 3 desalination plant in Saudi Arabia, solidifying the company’s position as a global leader. The plant is capable of producing 880,000 tons of freshwater a day, which can be used by 3 million people simultaneously

  • Acquired Water Treatment Business of AES of the US

    2005, Acquired Water Treatment Business of AES of the US

    Gained access to source technologies for key parts of the desalination plant in the RO area by acquiring the water treatment business of AES of the US (currently Doosan Hydro Technology) on October 3, 2005.

  • Acquired IMGB Romania

    2006, Acquired IMGB Romania

    Acquired a 99.76% interest in Romania’s largest casting and forging manufacturer Kvaerner IMGB at approximately KRW 14.5 billion.

  • Acquired Mitsui Babcock Energy

    2006, Acquired Mitsui Babcock Energy

    Acquired the UK-based boiler OEM and energy service company Mitsui Babcock for 20 billion yen (KRW 160 billion). The acquisition fulfilled a long-cherished dream of securing proprietary boiler technology that dated back to the company’s start in the business in the 1970s.

  • Signed Contract to Supply Major Equipment for Shin-Kori Units 3 and 4

    2006, Signed Contract to Supply Major Equipment for Shin-Kori Units 3 and 4

    Won an order for the major equipment for Shin-Kori nuclear power plant units 3 and 4, Korea’s first nuclear units to adopt the third-generation APR1400 design. APR1400 design offers dramatically improved safety and efficiency over the previous OPR1000 design.

  • Established Water R&D Center in Dubai and Tampa

    2006, Established Water R&D Center in Dubai and Tampa

    Solidified the company’s position as the global leader in desalination with the development of next-generation large capacity desalination technology.

  • Won Order for the World’s Largest Coal-Fired Thermal Power Plant in Mundra

    2006, Won Order for the World’s Largest Coal-Fired Thermal Power Plant in Mundra

    Won an EPC contract worth US$ 1.22 billion for the world’s largest 4000MW coal-fired thermal power plant in Mundra, India. The project was successfully completed in 2012.

  • Hydraulic Turbine Cast Steel, Stern Frame Casting Steel Chosen as World-Class Product

    2006, Hydraulic Turbine Cast Steel, Stern Frame Casting Steel Chosen as World-Class Product

    The company’s hydraulic turbine cast steel for hydroelectric power generation and stern frame casting steel for ships were chosen as World-Class Product.

  • China AP1000™ Nuclear Equipment Order

    2007, China AP1000™ Nuclear Equipment Order

    Won an order to supply major equipment for AP1000™ nuclear units for the Sanmen and Haiyang projects, China’s first third generation nuclear plants, since the company’s entry into the nuclear plant market in China in 1995.

  • First RO Desalination Order

    2007, First RO Desalination Order

    Won the Shuaibah Phase 3 Expansion RO project in Saudi Arabia, the company’s first RO project. This project was followed by the Shuwaikh RO project in Kuwait in March 2008 and the Jeddah RO project in Saudi Arabia in December 2008.

  • Power Plant Upgrade Order from Australia

    2007, Power Plant Upgrade Order from Australia

    Won a turbine upgrade order for the Eraring thermal plant in Australia (660MW X 4 units), followed by boiler upgrade order in 2009.

The Path to Global Leadership 2008 ~ today

  • “Global Leader in Power & Water” Vision with the new President and CEO Geewon Park

    2008, Announced “Global Leader in Power & Water” Vision with the new President and CEO Geewon Park

    After achieving business targets set in 2004 ahead of schedule, Doosan Heavy Industries & Construction was able to ramp up its CSR efforts.

  • US AP1000™ Nuclear Equipment Orders

    2008, US AP1000™ Nuclear Equipment Orders

    Successfully delivered the first shipment of three nuclear units to the US, a birthplace of nuclear power that resumed the construction of nuclear power plants after a 30-year hiatus.

  • Nuclear Equipment Order for Shin-Hanul Plant Units 1 and 2

    2008, Nuclear Equipment Order for Shin-Hanul Plant Units 1 and 2

    Won an order to supply major nuclear equipment for Shin-Hanul plant units 1 and 2 in Korea. This project marks the first time Korean nuclear units were produced entirely with domestic technology, including the Man-Machine Interface System (MMIS) and Reactor Coolant Pumps (RCP).

  • Strategic Alliance with US-based Burns and Roe

    2008, Strategic Alliance with US-based Burns and Roe

    Forged strategic alliance with Burns & Roe, a global leader in engineering and designing of coal-fired power plants to exchange and share engineering expertise, know-how and talent.

  • Investment in Carbon Capture Storage

    2008, Investment in Carbon Capture Storage

    Partnered with subsidiary Doosan Babcock to purchase a 15% equity share ownership in the Canada-based HTC, a possessor of proprietary CCS technology.

  • Successful “Oxyfuel Testing” by Doosan Babcock

    2009, Successful “Oxyfuel Testing” by Doosan Babcock

    Doosan Babcock successfully demonstrated the world’s first use of oxyfuel in boilers, using 40MW boilers commonly found in coal-fired plants

  • Obtained Core Steam Turbine Technology through the Acquisition of the Czech-based Skoda Power

    2009, Obtained Core Steam Turbine Technology through the Acquisition of the Czech-based Skoda Power

    With its KRW 800 billion acquisition of Skoda Power, Doosan Heavy enhanced its core power product line of boilers, turbines and generators, becoming a truly vertically integrated global leader in Power.

  • Built Doosan Vina Plant in Vietnam

    2009, Built Doosan Vina Plant in Vietnam

    Opened the KRW 300 billion Doosan Vina manufacturing plant, a large-scale manufacturing plant in central Vietnam. Composed of five factories and dedicated port facilities, the plant produces boilers, HRSGs, desalination equipment and material handling systems for projects worldwide.

  • BusinessWeek Recognition

    2009, BusinessWeek Recognition

    Ranked No. 4 out of 400 companies on the BusinessWeek’s World’s Best Companies list, the top ranking by a Korean firm. The company also ranked No. 2 on the Boston Consulting Group’s annual Value Creators list for 2009.

  • Established Doosan Power Systems (DPS)

    2010, Established Doosan Power Systems (DPS)

    In February, 2010, Doosan Power Systems was formed to coordinate the operations of Doosan Babcock of the UK and Skoda Power of the Czech Republic, providing total power solutions to Europe and the Americas.

  • APR1400 Nuclear Equipment Order from the UAE

    2010, APR1400 Nuclear Equipment Order from the UAE

    Participated in a consortium led by Korea Electric Power Corporation (KEPCO) that won the US$ 4 billion project in the UAE, in which the company will supply major equipment for APR1400 nuclear units. The project is the company’s largest accomplishment since it entered the nuclear power plant business.

  • Vietnam Mong Duong 2 Thermal Plant Order

    2010, Vietnam Mong Duong 2 Thermal Plant Order

    Won a US$ 1.3 billion order for the Mong Duong II thermal project in Vietnam from AES-VCM in December 2010. In the same month, the company also signed a framework agreement with the government of Vietnam to serve as the sole technical partner for a national project to localize equipment production for 600 MW coal-fired thermal plants.

  • Winning Record Total of KRW 12.9 trillion Orders

    2010, Winning Record Total of KRW 12.9 trillion Orders

    Set a new order record of KRW 12.9 trillion for projects in the Middle East, a key market for the company. The wins included the Raigh 6 project, the company’s largest overseas thermal plant project to date and the Ras Al Khair project, the world’s largest desalination project to date.

  • Rotor Shaft for Thermal Low-pressure Turbine Recognized as World-Class Product

    2010, Rotor Shaft for Thermal Low-pressure Turbine Recognized as World-Class Product

    The company’s rotor shaft for thermal low-pressure turbines was chosen as the World-Class Product.

  • CEO Leadership Recognition

    2010, CEO Leadership Recognition

    Chairman & CEO Park who spearheaded Doosan’s successful privatization and transformation into a global company was highly recognized. He received the prestigious Gold Tower Order of Industrial Service Merit at the 1st Atomic Energy Day held on December 27, 2010, in recognition of his contributions to the successful win of the nuclear project in the UAE. Previously, he also received the top award at the CEO Grand Prix Awards in 2009.

  • Chennai Works and Lentjes Acquisitions

    2011, Chennai Works and Lentjes Acquisitions

    Acquired India-based boilermaker Chennai Works (currently Doosan Power Systems India) in February, gaining competitive edge in the Indian market. In November, subsidiary Doosan Power Systems (DPS) acquired German-based Lentjes (currently Doosan Lentjes), gaining access to eco-friendly technologies, such as Circulating Fluidized Bed (CFB) boilers.

  • First Major MED Desalination Plant Order

    2011, First Major MED Desalination Plant Order

    Won the Yanbu Phase 2 Expansion (15 MIGD) EPC desalination project from Saline Water Conversion Corporation (SWCC) in Saudi Arabia. This made the company the first in the global water industry to secure a project and technology portfolio spanning the top three major desalination technologies – Multi-Stage Flash (MSF), Reverse Osmosis (RO) and Multi-Effect Distillation (MED).

  • 3MW Wind Turbine International Certification

    2011, 3MW Wind Turbine International Certification

    The company’s 3MW wind turbine system, launched as a government project in 2006, won international type certification from DEWI-OCC of Germany, paving the way for overseas sales.

  • Taean IGCC Demonstration Plant Order

    2011, Taean IGCC Demonstration Plant Order

    Signed an agreement on November 15 on the construction of 300 MW Taean IGCC project, Korea’s first integrated-gasification combined-cycle demonstration plant.

  • CSR Agreement with Changwon City

    2011, CSR Agreement with Changwon City

    Doosan Heavy Industries & Construction pursues sustainable management by fulfilling its social responsibilities as a corporate citizen and contributing to local communities.

  • Commercial Nuclear Reactor Chosen as World-Class Product

    2011, Commercial Nuclear Reactor Chosen as World-Class Product

    Nuclear reactors, turbine-generator rotor shafts and oil-fired boilers were additionally chosen as World-Class Products for commercial nuclear power plants.

  • Announced “The Doosan Way” for the Next 100 Years

    2012, Announced “The Doosan Way” for the Next 100 Years

    Announced “The Doosan Way,” Doosan’s corporate philosophy to continue the remarkable transformation and success of the past 100 years into the next 100 years.

  • Bulk Order Ⅱ from India

    2012, Bulk Order Ⅱ from India

    Indian subsidiary DPSI won orders from India’s state-owned power utility NTPC, including three 800 MW boilers for the Kudgi project in Karnataka and two additional 800 MW boilers for the Lara project in Chhattisgarh.

  • Acquired Enpure of the UK

    2012, Acquired Enpure of the UK

    Strengthened competitive edge in water treatment business by acquiring UK-based Enpure (currently Doosan Enpure) to gain access to world-class preconditioning equipment design as well as water treatment technology.

  • Yanbu Phase 3 Desalination Plant Order from Saudi Arabia

    2012, Yanbu Phase 3 Desalination Plant Order from Saudi Arabia

    The Yanbu Phase 3 Desalination Plant valued at KRW 1.1 trillion in Saudi Arabia supplies water to the neighboring city of Media using an MSF method. The plant produces 550,000 tons (121MIGD) of freshwater that can be used by 1.8 million people simultaneously. (Photo: Yanbu Phase 2 MED Desalination Plant completed in 2013)

  • Commercial Steam Generator Chosen as World-Class Product

    2012, Commercial Steam Generator Chosen as World-Class Product

    The company’s steam generators and super-large forged backup roll for plate rolling mill were chosen as World-Class Product.

  • Management Transparency Awards and Corporate Governance Awards

    2013, Management Transparency Awards and Corporate Governance Awards

    The Company won a grand prize at the Management Transparency Awards as well as Corporate Governance Awards in recognition of its effort to promote transparency, ethics and CSR in all areas of its business.

  • Transferred HRSG Business to Doosan Engineering & Construction

    2013, Transferred HRSG Business to Doosan Engineering & Construction

    Transferred the company’ s Heat Recovery Steam Generator (HRSG) business to Doosan Engineering & Construction.

  • Entered into the Latin American Market with Escondida Plant in Chile

    2013, Entered into the Latin American Market with Escondida Plant in Chile

    The Escondida Desalination Plant, the largest RO-mode project in Latin America, will produce 220,000 tons of freshwater a day that can be used by 550,000 people simultaneously. The project is the first of its kind in a region other than the Middle East for the company.

  • R&D Center in Saudi Arabia

    2013, R&D Center in Saudi Arabia

    Dammam Water R&D Center in Saudi Arabia plays a pivotal role in Doosan water R&D global network, focusing on the development of core technology in evaporation method and hybrid desalination fields.

  • Shin-Boryeong Thermal Power Plant Units 1 & 2 Orders

    2013, Shin-Boryeong Thermal Power Plant Units 1 & 2 Orders

    Won an order worth KRW 850 billion to supply boilers and turbine generators for the Shin-Boryeong thermal plant units 1 and 2. The plants are the first 1000 MW Ultra-Supercritical (USC) coal-fired thermal power plants developed with domestic technology. These eco-friendly and high-efficiency power plants are more efficient than conventional coal-fired thermal power plants and generate less carbon dioxide.

  • Won Vinh Tan 4 Thermal Power Plant Project in Vietnam

    2013, Won Vinh Tan 4 Thermal Power Plant Project in Vietnam

    Won an EPC contract for the Vinh Tan 4 coal-fired thermal power plant to be built in Binh Thuan, some 230km east of Ho Chi Minh City. As an EPC contractor, Doosan is to lead the entire process from equipment manufacture, installation and trial operation.

  • Integral Heads Selected as World-Class Product

    2013, Integral Heads Selected as World-Class Product

    The company’s integral heads and excitation systems for major nuclear equipment were chosen as the World-Class Products.

  • Doosan Babcock Signed Service Agreement with EDF of France

    2014, Doosan Babcock Signed Service Agreement with EDF of France

    Subsidiary Doosan Babcock signed a long-term service agreement with French energy giant EDF to support the operations of the energy company’s 14 nuclear power stations in the UK.

  • Integrated Energy System Order for Dongtan 2 New City

    2014, Integrated Energy System Order for Dongtan 2 New City

    Signed a KRW 380 billion contract by Korea District Heating Corporation to supply the integrated energy systems to be built in Dongtan 2 New City, a city being created in Hwaseong, just south of Seoul in South Korea.

  • Nuclear Equipment Order for Shin-Kori Units 5 and 6

    2014, Nuclear Equipment Order for Shin-Kori Units 5 and 6

    Signed a KRW 2.3 trillion contract to supply main equipment for Shin-Kori Nuclear Power Plant Units 5 and 6 together that adopt Korean-designed APR 1400, boasting of significantly enhanced safety.

  • Enlistment in Dow Jones Sustainability Index

    2014, Enlistment in Dow Jones Sustainability Index

    Received a certificate of enlistment in the Dow Jones Sustainability Index (DJSI) at the “2014 DJSI International Conference.” DJSI is a global standard that evaluates the sustainability of management by comprehensively assessing companies in the economic, environmental, and social aspects, and the company has been enlisted in Korea Class.

  • 3MW Wind Turbine Recognized as World-Class Product

    2014, 3MW Wind Turbine Recognized as World-Class Product

    The company’s WinDS3000, a 3MW-class offshore wind turbine was chosen as the World-Class Products.

  • Won Nghi Son 2 Thermal Power Plant Project in Vietnam

    2014, Won Nghi Son 2 Thermal Power Plant Project in Vietnam

    Won an order for the 1330MW (665MWX2) Nghi Son 2 thermal power plant project in Vietnam. This is the company’s 3rd EPC contract following its Mong Duong 2 and Vinh Tan 4 thermal power plant projects in Vietnam.

  • Entered into the Central Asian Power Market with Karabatan Plant in Kazakhstan

    2014, Entered into the Central Asian Power Market with Karabatan Plant in Kazakhstan

    Won the first order for the 310MW Karabatan combined cycle thermal power plant project in Kazakhstan, paving the way for its advancement into the Central Asian power market.

  • Achieved 50 Million Safe Man Hours

    2015, Achieved 50 Million Safe Man Hours

    Doosan’s Rabigh 2 thermal power plant construction project which was constructed for SEC has achieved 50 million safe man-hours. Doosan established an advanced EHS culture through systematic and differentiated EHS activities in Saudi Arabia. The record of 50 million safe man-hours is the longest duration of accident-free operation among any global project Doosan has performed to date.

  • Won Song Hau 1 Thermal Power Plant Project in Vietnam

    2015, Won Song Hau 1 Thermal Power Plant Project in Vietnam

    Won an order for the 1,200MW Song Hau coal-fired power plant this past April. As the main EPC contractor, Doosan will supply the main equipment of the plant including boilers and turbines as well as construct the plant. The plant is expected to contribute to easing power shortages in southern Vietnam.

  • Achieved Cumulative Production of 30 Reactor Vessels and 100 Steam Generators

    2015, Achieved Cumulative Production of 30 Reactor Vessels and 100 Steam Generators

    Started manufacturing reactor vessels in the early 1980s beginning with Hanbit unit 1 and produced Doosan’s 30th reactor vessel this summer, the VC Summer unit 3. Moreover, last May Doosan delivered their 100th steam generator after 30 years of manufacturing nuclear steam supply systems.

  • Ras Al Khair Wins ‘2015 Desalination Plant of the Year’

    2015, Ras Al Khair Wins ‘2015 Desalination Plant of the Year’

    The Ras Al Khair Ph.1 seawater desalination plant, constructed by Doosan Heavy Industries & Construction in Saudi Arabia, was awarded ‘Desalination Plant of the Year’ at the 2015 Global Water Awards hosted by the Global Water Intelligence (GWI) in Zurich, Switzerland. GWI is a world-renowned specialty journal on water.

  • Won Order for Construction of Shin-Kori Nuclear Power Plant Units 5 and 6

    2015, Won Order for Construction of Shin-Kori Nuclear Power Plant Units 5 and 6

    Has successfully won an order for construction of the Shin-Kori nuclear power plant units 5 and 6 this past June. Doosan had also signed a deal to supply the main nuclear equipment to the plant in 2014. This latest contract helps strengthen Doosan’s capabilities as a leading nuclear power plant facility maker.

  • Sewage Treatment Plant Orders from Oman and England

    2015, Sewage Treatment Plant Orders from Oman and England

    Won the phase 2 of the Al-Ansab sewage treatment plant from Oman, the first order in the Middle East, and Doosan Enpure, the company’s subsidiary, won the phase 2 of Bellozanne sewage treatment works replacement plant in England.

  • Became Main Business Partner of ESS under Smart Grid Implementation Project

    2015, Became Main Business Partner of ESS under Smart Grid Implementation Project

    Became the main business partner to deliver the energy storage systems (ESS) under the 2015 Smart Grid Implementation Project, which was hosted by the Korea Smart Grid Institute. With its first achievement of supplying 1MW ESS facilities with Kwangjin Engineering, Doosan will also supply the main equipment for the 2.4MW ESS with Korea Power Exchange (KPX), the largest output among all the ESSs installed in a single building in Korea to date.

  • Won Orders for 1000MW-Class Thermal Power Plant Projects at Home

    2015, Won Orders for 1000MW-Class Thermal Power Plant Projects at Home

    Starting with its first project to supply the main equipment for Shin Boryeong thermal power plant in 2013, Doosan has successfully won orders for 1000MW-class thermal power plant projects at home, including the Gangneung Anin thermal power project in April, the Shin Seocheon thermal power project in November and the Goseong Hai thermal power plant project in December.

  • Entered into South African Power Market

    2015, Entered into South African Power Market

    Laid foundations to expand its South African power market by making a contract to refurbish the aged facilities at the Morupule A power plant in Botswana. Through efforts to expand and diversify its markets, Doosan has successfully made inroads into new markets, including South Africa and Turkey this year.

  • Won Major Projects in the UK

    2016, Won Major Projects in the UK

    Doosan Babcock won a project to transform fuel for 140MW-class Lynemouth Thermal Power Plant Unit 3, which had been operating since 1972, into biomass, an ecofriendly fuel. Doosan Enpure also bagged the “Horsley water treatment plant improvement project” in March this year after winning the project to expand and improve the “Woodmansterne water treatment plant” last year.

  • Rabigh 2 Project Won “Power and Desalination Project of the Year Award”

    2016, Rabigh 2 Project Won “Power and Desalination Project of the Year Award”

    The Rabigh 2 project implemented by Doosan Heavy Industries & Construction in Saudi Arabia was given the “Power and Desalination Plant of the Year award” by Middle East Economic Digest (MEED), an economic magazine in the Middle East.

  • Won Seawater Desalination Plant Project in Kuwait

    2016, Won Seawater Desalination Plant Project in Kuwait

    Doosan Heavy Industries & Construction signed a 460 billion won contract to construct, maintain, and repair the “Doha Phase 1” seawater desalination plant adopting Reverse Osmosis (RO) technology. The feat is meaningful since Doosan Heavy Industries & Construction beat world-renowned rival firms by banking on its superior technology including highly advanced pretreatment process and credibility.

  • Acquired 1Energy Systems, US Energy Storage System Firm

    2016, Acquired 1Energy Systems, US Energy Storage System Firm

    Doosan Heavy Industries & Construction acquired 1Energy Systems (now known as Doosan GridTech), a company that possesses fundamental technology in ESS (energy storage system) control systems in July, and won the first ESS order in the US in October. Doosan Heavy Industries & Construction has secured the industry’s best competitiveness in the ESS business and laid the foundation for expanding businesses to include the Microgrid market.

  • Earned Highest Grade in Shared Growth Index

    2016, Earned Highest Grade in Shared Growth Index

    Doosan Heavy Industries & Construction received the top grade, the highest honor, in the shared growth index assessment 2015 conducted by the National Commission for Corporate Partnership. Doosan Heavy Industries & Construction acquired the highest grades in “track records in the implementation of fair trade and shared growth” and “assessment of perception among SMEs” that surveyed partner firms; thus earning recognition as a company that strengthens shared growth with business partners.

  • Started Commercial Operation of Taean IGCC Plant

    2016, Started Commercial Operation of Taean IGCC Plant

    Taean Integrated Gasification Combined Cycle (IGCC) Plant, which was supplied by Doosan Heavy Industries & Construction through the EPC method, started commercial operation in August. The company became the seventh in the world to commercialize an IGCC plant. A project implemented as part of the government’s renewable energy R&D project in 2006, the Taean IGCC plant is an outcome of the project to develop technology for the first “Korean standard 300MW-class IGCC demonstration plant.”

  • Launched Korea’s First Commercial Offshore Wind Farm

    2016, Launched Korea’s First Commercial Offshore Wind Farm

    Jeju Tamna Offshore Wind Farm, Korea’s first commercial offshore wind power complex, started operation on September 29. Doosan Heavy Industries & Construction constructed 10 units of 3MW-class offshore wind power generator in the complex through the EPC method, ushering in the era of offshore wind power in Korea.

  • Won Successive Large EPC Projects in India, Saudi Arabia, etc.

    Won Successive Large EPC Projects in India, Saudi Arabia, etc.

    Doosan Heavy Industries & Construction won large-scale EPC projects in succession including the 2.8 trillion won Obra-C and Jawaharpur projects in India, the one trillion won Fadhili project in Saudi Arabia, and the 950 billion won Subic Redondo project in the Philippines in the second half of 2016, solidifying its position in the global power market.

  • Doosan to Provide Wastewater Treatment Technology to Achieve Zero Liquid Discharge

    Doosan Heavy Industries & Construction signed a contract with Korea South-East Power Corporation (KOEN) to supply them with its advanced wastewater treatment technology – the zero liquid discharge (ZLD) system.
    Doosan developed its advanced ZLD technology in-house, capitalizing on its industry-leading seawater desalination technologies for which it has an extensive track record.

  • Doosan to Upgrade Indonesian Power Plant

    Doosan Heavy Industries & Construction and its consortium partner PT. Hutama Karya, an Indonesian state-owned construction company, received a 470 billion won order from PT. Perusahaan Listrik Negara (PLN), an Indonesian government-owned sole electricity utility company, for Muara Tawar Combined Cycle Power Plant.

  • Installed 17,000-ton forging press

    Doosan Heavy Industries & Construction held a ceremony to celebrate the installation of a new 17,000-ton forging press – the world’s largest to date – at the forging plant of its manufacturing complex in Changwon, South Gyeongsang province in South Korea.
    The new 17,000-ton forging press is 29 meters tall and 9 meters wide, and it can forge steel ingot with the strength equivalent to 240,000 men pressing on the metal at the same time. It is currently the world’s biggest four-pillar type forging press to date.

  • Won ‘Desalination Company of the Year’ Award from Global Water Intelligence

    Doosan Heavy Industries & Construction was named as the winner of the ‘Desalination Company of the Year’ award by Global Water Intelligence (GWI), one of the industry’s leading research organizations.
    The prestigious award is a clear recognition of Doosan Heavy’s leading contribution to the desalination industry.

  • Acquired 5.5MW Offshore Wind Power Technologies

    Doosan Heavy Industries & Construction signed a contract to acquire the 5.5MW offshore wind power technology developed by Hyundai Electric & Energy Systems.
    The 5.5MW wind turbine boasts of the largest capacity among domestic products of its kind. The system was installed in Gimnyeong Pilot Complex on Jeju Island and has been in operation for about three years.

  • Completed Acquisition of US Gas Turbine Service Firm ACT

    Doosan Heavy Industries & Construction finalized the acquisition of ACT Independent Turbo Services (ACT), a US gas turbine service company, and established Doosan Turbomachinery Services.
    With the acquisition, Doosan will secure not only professionals and facilities specializing in gas turbine services, but also order backlogs and know-how; thus instantly entering the US gas turbine market with a capacity of 16GW per annum.

  • Won Order for FGD System of Shin Seocheon Thermal Power Plant

    Doosan Heavy Industries & Construction won the order for the flue gas desulfurization (FGD) system of Shin Seocheon Thermal Power Plant from Korea Midland Power Co., Ltd. (KOMIPO), aggressively penetrating the eco-friendly power generation market of desulfurization and denitrification systems, which were designed to reduce atmospheric pollutants.

  • Entered Wind Power Market in Vietnam

    Doosan Heavy Industries & Construction signed agreements with local companies in Hanoi to lay the groundwork for developing the wind power market in Vietnam. Doosan signed a business agreement with Vietnam’s state power company Vietnam Electricity (EVN) to develop an energy storage system (ESS)-linked 3MW offshore wind power demonstration project, marking a milestone in the company’s renewable energy business.

  • Successively Won Orders for Energy Storage System (ESS) at Home and Abroad

    Doosan Heavy Industries & Construction has recently been successively winning contracts for energy storage system (ESS) projects.
    The company signed a contract with SK E&S to deliver a power demand management ESS facility. Furthermore, with Doosan Heavy’s US-based subsidiary, Doosan GridTech, also winning a contract together with Consumers Energy to implement an ESS at a substation in Kalamazoo, which is located in the southwestern part of Michigan, the company is effectively building up its competitiveness in both the domestic and overseas markets.

  • Doosan to develop Korea’s largest 8MW offshore wind power system

    Doosan Heavy Industries & Construction (DHIC) has been selected as the main contractor for the 8MW Large-Capacity Offshore Wind Power System Development project, a state project sponsored by the Korea Institute of Energy Technology Evaluation and Planning (KETEP). With this new development, the Company will be able to expand its wind power system lineup to 8 MW from the current 3 MW and 5 MW lineup. The development of this model will help aggressively penetrate the overseas wind power market, where the growing trend is for large scale models and it will also help increase the share of local supplier products in the Korean market, where foreign models currently account for more than half of the market share.

  • Secured an order for a seawater desalination plant in Sharqiyah, Oman

    Doosan took part in a 230 billion won desalination project in Sharqiyah, Oman. With the partners in its consortium, Doosan will carry out the engineering, procurement, and construction for the project. Furthermore, with this project, the Company has broadend its business scope from construction to development and operation.

  • Doosan to Build 1.6 Tril. Won Thermal Power Plant in Indonesia

    Doosan signed a deal with Indonesia’s PT Indo Raya Tenaga (IRT) to build Jawa 9 and 10 power stations. Under the agreement, Doosan will build Jawa 9 and 10 power plants in Cilegon of Java’s west coast, only 120 km from Jakarta, the capital of Indonesia.

  • Participated in Korea’s First Hydrogen Liquefaction Demonstration Project

    Doosan plans to supply Korea’s first hydrogen liquefaction plant to support Changwon City’s project to build a demonstration site for hydrogen energy circulation and storage systems.

  • Acquired Korea’s First International Certification for 5.5 MW Offshore Wind Power System

    Doosan became the first Korean company to receive the “Type Certificate” for its 5.56W offshore wind power system from the UL DEWI-OCC, an international certification agency. The new system boasts of having the largest capacity of any model in Korea’s wind power market.

  • Set to Complete Development of Large Gas Turbine for Power Generation … Korea to Become Fifth Country to Own Independent Model

    Doosan had held the final assembly event at the head office in Changwon for the first large gas turbine for power generation. It’s currently being developed as part of a national project sponsored by the Ministry of Trade, Industry and Energy and the Korea Institute of Energy Technology Evaluation and Planning. Once it has passed an in-house performance test in 2020, Korea will become one of the five countries along with the United States, Germany, Japan, and Italy to have secured independent gas turbines for power generation.

  • Set to Expand Gas Turbine Service Business at Home and Abroad

    Doosan signed a memorandum of understanding with MCV, American private energy firm, to extend cooperation in maintenance and improvement of MCV’s gas turbines. With the MOU, Doosan expects to strengthen its foothold in gas turbine aftermarket business. In the Korean domestic market, it had won a contract to maintain the exhaust cylinders of three gas turbines installed at Units 4 to 6 of the Ulsan Oil Fired & C.C Power Complex. The order was a follow-up to the successful maintenance of the gas turbine exhaust cylinder of Unit 3 of the same complex.

  • Materialize the First Entry into Small Modular Reactor Market in USA

    Doosan completed equity investment in NuScale Power for its small modular reactor (SMR) technology and executed a business collaboration agreement with NuScale Power for the NuScale Power Module™ (NPM) and other equipment supply. Doosan plans to supply equipment worth at least $1.3 billion to NuScale Power for both U.S. and global deployment of the NuScale power plant.

Click the following links to see more related topics.

Our Aspiration & Core Values

Our Aspiration & Core Values

The Doosan Credo is a set of principles that represent our philosophies and unique way of doing business. These principles have been the foundation of Doosan’s success for the past century. The Credo consists of Doosan’s “Aspiration” and “Core Values”.

Global Performances

Global Performances

Doosan Heavy Industries & Construction plays a significant role in driving the nation's economic development by supplying casting and forging products for industrial facilities, power generation facilities for nuclear and thermal plants, desalination plants as well as material handling systems to domestic and global plant markets.

Check back soon for new video contents
Download
Close